Stove Installation in Atherton
HETAS registered stove installation in Atherton — terraces and semis between Leigh and Bolton, including Chowbent and Hag Fold.
Stoves in Atherton
Atherton — “Bent” to locals — sits between Leigh and Bolton, a former mining and nail-making town. The centre around Market Street and Bolton Old Road is Victorian terraces; around it are inter-war semis and the post-war estates of Hag Fold and Hindsford. Most homes have a chimney to work with.
Reopen, line, fit
The usual Atherton job is bringing a closed-off chimney breast back into use: open it up, sweep and camera the flue, line it, and fit a DEFRA-exempt stove with the correct hearth. On the newer estates with no chimney we fit a twin-wall flue instead. Atherton work often ties in with Leigh and Tyldesley.
What we do in Atherton
- Reopening and lining chimneys for wood burning and multi-fuel stoves.
- Twin-wall flue systems for homes with no existing chimney.
- HETAS certified installation, registered with the council.
- Also covering Tyldesley, Hindley and Astley.
Frequently asked
Is Atherton a Smoke Control Area?
Yes, Atherton is within Wigan's Smoke Control Area, so a DEFRA-exempt stove and authorised fuel are needed. We fit exempt appliances as standard and confirm your address at survey.
Do I need a HETAS registered installer to fit a wood burning stove?
You don't have to, but it is the simplest way to stay legal. A HETAS registered installer self-certifies that the stove meets Building Regulations (Approved Document J) and notifies your local council. The alternative is paying Building Control to inspect the work. Tru-Heating is HETAS registered, so every installation is self-certified with an official certificate.
Can you install a wood burning stove without an existing chimney?
Yes. Where there is no masonry chimney we fit an insulated twin-wall flue system that runs internally or up an external wall, to HETAS and Building Regulations standards.
How long does a stove installation take?
A straightforward install into an existing chimney is usually one day. A new twin-wall flue system, or work that involves opening up a fireplace or building a hearth, typically takes two to three days.
Get a free fixed quote
Tell us about your project in Atherton and we’ll arrange a survey.
Request a quote