Stove Installation in Atherton

HETAS registered stove installation in Atherton — terraces and semis between Leigh and Bolton, including Chowbent and Hag Fold.

Areas — Atherton

Stoves in Atherton

Atherton — “Bent” to locals — sits between Leigh and Bolton, a former mining and nail-making town. The centre around Market Street and Bolton Old Road is Victorian terraces; around it are inter-war semis and the post-war estates of Hag Fold and Hindsford. Most homes have a chimney to work with.

Reopen, line, fit

The usual Atherton job is bringing a closed-off chimney breast back into use: open it up, sweep and camera the flue, line it, and fit a DEFRA-exempt stove with the correct hearth. On the newer estates with no chimney we fit a twin-wall flue instead. Atherton work often ties in with Leigh and Tyldesley.

What we do in Atherton

  • Reopening and lining chimneys for wood burning and multi-fuel stoves.
  • Twin-wall flue systems for homes with no existing chimney.
  • HETAS certified installation, registered with the council.
  • Also covering Tyldesley, Hindley and Astley.
Common Questions

Frequently asked

Is Atherton a Smoke Control Area?

Yes, Atherton is within Wigan's Smoke Control Area, so a DEFRA-exempt stove and authorised fuel are needed. We fit exempt appliances as standard and confirm your address at survey.

Do I need a HETAS registered installer to fit a wood burning stove?

You don't have to, but it is the simplest way to stay legal. A HETAS registered installer self-certifies that the stove meets Building Regulations (Approved Document J) and notifies your local council. The alternative is paying Building Control to inspect the work. Tru-Heating is HETAS registered, so every installation is self-certified with an official certificate.

Can you install a wood burning stove without an existing chimney?

Yes. Where there is no masonry chimney we fit an insulated twin-wall flue system that runs internally or up an external wall, to HETAS and Building Regulations standards.

How long does a stove installation take?

A straightforward install into an existing chimney is usually one day. A new twin-wall flue system, or work that involves opening up a fireplace or building a hearth, typically takes two to three days.

Get a free fixed quote

Tell us about your project in Atherton and we’ll arrange a survey.

Request a quote